Share

Day: 11 September 2020

Day: 11 September 2020

AUG.2020 PARK HOUSE – Under Construction

Park House the 48 residential units development at 15 Bath road, Slough is under construction and started to show the main structure of the proposal in Steel structure with Metsec SFS Framing. JAIA were appointed to propose a scheme for a phased PD and new build design. The level of complexity was high for this project, […]

read more