Share

Day: 3 September 2014

Day: 3 September 2014

AUG. 2014 Clapham North

This mixed use development located in Clapham North has started to show its entire structure on site. The development comprises 5,000 sq ft ground floor retail and 4 No. 2 bed flats on 1st and 2nd floor. The proposed scheme uses SIP(Structural Insulated Panel) board to meet the client requirement to shorten the on-site construction […]

read more

JUL. 2014 Burghley Road House B Completion

This 7,000 sq ft spacious six bedroom Wimbledon house in a traditional style with contemporary details has been completed.  The bespoke  featured stair and double height opening  space connect through the open spaces on the ground and lower ground floor and large openings to the terraces allow extension of internal space to outside. Various spatial […]

read more